Please note
The test rates listed in this website are only applicable to clients who comply with the requirements in our Testing Notes and Terms and Conditions and pay all submitted invoices within 30 days from the date of invoice
The test rates listed in this website are only applicable to clients who comply with the requirements in our Testing Notes and Terms and Conditions and pay all submitted invoices within 30 days from the date of invoice
Description | Price |
Consolidation in a Hydraulic Cell up to 4 days duration (BS1377 : Part 6 : Clause 3 : 1990) |
Up to 100 mm diameter: £ 340.00 150 mm diameter: £ 360 250 mm diameter: £ 420.00 |
Extra over days in excess of initial 4 days | + £ 35.00 |
Remoulding specimen at as-received moisture content | + £ 20.00 |
Coefficient(s) of Consolidation and Compressibility
Determining consolidation properties in a particular mode/orientation of drainage, particularly where the in-situ material is in layers of different permeabilities.
Enough material to fill apparatus with an internal diameter of 76mm, 100mm, 150mm or 250mm and a height of approximately 1/3 to 1/2 the diameter.
Rowe Cell
Description | Price |
Permeability in a Hydraulic Cell up to 4 days duration (BS1377 : Part 6 : Clause 4 : 1990) |
Up to 100 mm diameter: £ 340.00 150 mm diameter: £ 360 250 mm diameter: £ 420.00 |
Extra over days in excess of initial 4 days | + £ 35.00 |
Remoulding specimen at as-received moisture content | + £ 20.00 |
Coefficient(s) of Permeability
Determining permeability in a particular mode/orientation, particularly where the in-situ material is in layers of different permeabilities.
Enough material to fill apparatus with an internal diameter of 76mm, 100mm,150mm or 250mm, and a height of approximately 1/3 to 1/2 the diameter.
Rowe Cell